The Workshop, Jenny Green Lane, Bentworth, Alton

Hampshire GU34 5NN

 

Telephone 01420 561771

Fax 01420 563832

email

Heating

Ventilating

Air conditioning

Heat recovery

Building services systems

Clean Rooms

IT Equipment Rooms

Home
News
Customers
Projects
Case Studies
Suppliers
August 2005 Air conditioning and ventilation system for a sports outlet in Nuneaton, located in the Ropewalk Shopping Centre. See the contracts page for more details.
August 2005 Air conditioning and heat recovery ventilation for Thales electronic test laboratories in Cheadle, Cheshire. See the contracts page for more details.
August 2005 Air conditioning in production are of Riverprint of Farnham
July 2005 Air conditioning in computer rooms at South Thames College, Wnadsworth
July 2005 Heating and ventilation for Playworld in Basingstoke
July 2005 Air conditioning installation for Zero Quattro Italian Restaurant in Wimbledon village.
March 2005 Air conditioning installed to improve drying rates in the laundry department of The Meath residential home.
February 2005 Contract received from South Thames College to install air conditioning into lecture rooms, providing a better environment for Students and Lecturers as well as better operating conditions for the computers. The improved conditions allow South Thames College to attract more students to their courses.
February 2005 Office air conditioning installed for British Caravans of Virginia Water, Surrey
February 2005 Air conditioning contract received for the moulding oven room at KeaFlex Mouldings of Bordon, Hampshire. This installation provides a much improved working environment for the staff employed in working on this high temperature process.
January 2005

Pyramid awarded contract for Elizabeth House, Woking Surrey

Elizabeth house covers four floors of half the building totalling 2,800 square metres floor area.

January 2005

Air conditioning system installed in the 4D projection room at Legoland near Windsor. This replaced the inconveniently placed system originally fitted directly above the projector. Maintenance is now easier and does not have any impact on projector operation.

At the Fire Truck ride ventilation systems were also provided for the toilets which are situated each side of the control room.

December 2004 Air conditioning contract received from Micheldever Tyres, Hampshire. Contract due for completion in February

Top of page